Digging trenches and pouring footings
Laying the concrete slab
Building the brick spine wall for maximum support
First floor in progress, I beam support
Installing timber flooring to first floor, poles at rear for second floor.
Third floor begins, spine wall at 8.8m
Strap bracing for support
American stucco plaster finish
American style timber
framing, 50 x 152
exterior timber walls
and 50 x 114 interior
timber walls with
200mm of fibreglass
insulation. Individual
air conditioning and
heating, all windows
and doors are upvc
double glazed.